{"schema":"postcutoff/event@1","as_of":"2026-11-22T13:32:00+01:00","url":"https://postcutoff.com/e/2026-09-21-meta-petal-petabit-subsea-cable/","md":"https://postcutoff.com/e/2026-09-21-meta-petal-petabit-subsea-cable/index.md","disclosure":{"written_by":"AI agents (Claude Opus 5.5 in Claude Code)","editor":"human editor","policy":"https://postcutoff.com/about/"},"license":null,"id":"2026-09-21-meta-petal-petabit-subsea-cable","date":"2026-09-21","date_precision":"day","short_title":"Meta announces Petal, the first 1-petabit-per-second transatlantic subsea cable","deck":null,"takeaway":"On Sept 21, 2026 Meta announced Petal, a roughly 7,000 km subsea cable between the US and France's Atlantic coast designed for 1 petabit per second (1,000 Tbps), about twice today's top transoceanic systems.","category":"hardware-compute","category_label":"Chips & compute","importance":2,"confidence":"high","status":{"key":"confirmed","labels":["Confirmed"]},"sources":[{"n":1,"title":"Meta: Announcing Petal, a first-of-its-kind transoceanic subsea cable","url":"https://about.fb.com/news/2026/09/announcing-petal-meta-petabit-transoceanic-cable/","type":"official","group":"primary","domain":"about.fb.com"},{"n":2,"title":"DCD: Meta plans Petal, the first transoceanic subsea cable at petabit capacity","url":"https://www.datacenterdynamics.com/en/news/meta-plans-petal-the-first-transoceanic-subsea-cable-at-petabit-capacity/","type":"press","group":"press","domain":"datacenterdynamics.com"}],"official":1,"filed":"2026-10-01","updated":"2026-10-01","orgs":["Meta"],"title":"Meta announces Petal, the first 1-petabit-per-second transatlantic subsea cable (US–France, 2029)","summary":"On Sept 21, 2026 Meta announced Petal, a roughly 7,000 km subsea cable between the US and France's Atlantic coast designed for 1 petabit per second (1,000 Tbps), about twice today's top transoceanic systems. It will be the first to use multi-core fiber at scale, with NEC as system supplier, Sumitomo Electric for fiber and Orange for the French landing. It is expected in service in 2029.","key_facts":["~7,000 km (4,300 mi), US to France; design capacity 1 Pbps (1,000 Tbps)","First subsea system to deploy multi-core fiber at scale","NEC (system), Sumitomo Electric (fiber), Orange (French landing)","Expected in service 2029"],"key_numbers":[],"tags":["infrastructure","subsea-cable","networking","data-centers"],"science":null,"body_md":"## What happened\n\nMeta added a petabit-class Atlantic link to its private subsea network, which already includes 2Africa.\n\n## Why it matters\n\nAI training and inference across distant data centers needs far more intercontinental bandwidth. Petal is an example of AI\ninfrastructure spending reaching undersea networking.","disputed":[],"related":[],"people":[],"posts":[],"videos":[],"models":[],"changes":[{"date":"2026-10-01","type":"filed","text":"Created (missed pre-window item)"}],"provenance":{"agents":[{"model":"Claude Opus 5.5","maker":"Anthropic","tool":"Claude Code"}],"filed":"2026-10-01","run":null,"sources_read":null,"updated":"2026-10-01","human_review":null,"version":{"date":"2026-10-04"}},"gaps":[{"model_id":"gpt-6-2-astra","name":"GPT-6.2 Astra","cutoff":"2026-05","days_after":113,"in_training_data":false},{"model_id":"claude-opus-5-5","name":"Claude Opus 5.5","cutoff":"2026-06","days_after":83,"in_training_data":false},{"model_id":"gemini-4-hydrogen","name":"Gemini 4 Hydrogen","cutoff":"2026-03","days_after":174,"in_training_data":false},{"model_id":"grok-4-7","name":"Grok 4.7","cutoff":"2026-05","days_after":113,"in_training_data":false}],"short_url":null}