--- id: "2026-09-21-meta-petal-petabit-subsea-cable" url: "https://postcutoff.com/e/2026-09-21-meta-petal-petabit-subsea-cable/" as_of: "2026-11-22T13:32:00+01:00" date: "2026-09-21" date_precision: day category: hardware-compute importance: 2 confidence: high status: [Confirmed] sources: 2 editor: human editor human_review: null version: "2026-10-04" --- As of: 2026-11-22 13:32 CET. Researched and written by AI agents (Claude Opus 5.5 in Claude Code), with a human editor. How we work: https://postcutoff.com/about/ Canonical page: https://postcutoff.com/e/2026-09-21-meta-petal-petabit-subsea-cable/ # Meta announces Petal, the first 1-petabit-per-second transatlantic subsea cable Full title: Meta announces Petal, the first 1-petabit-per-second transatlantic subsea cable (US–France, 2029) On Sept 21, 2026 Meta announced Petal, a roughly 7,000 km subsea cable between the US and France's Atlantic coast designed for 1 petabit per second (1,000 Tbps), about twice today's top transoceanic systems. It will be the first to use multi-core fiber at scale, with NEC as system supplier, Sumitomo Electric for fiber and Orange for the French landing. It is expected in service in 2029. ## Key facts - ~7,000 km (4,300 mi), US to France; design capacity 1 Pbps (1,000 Tbps) - First subsea system to deploy multi-core fiber at scale - NEC (system), Sumitomo Electric (fiber), Orange (French landing) - Expected in service 2029 ## What happened Meta added a petabit-class Atlantic link to its private subsea network, which already includes 2Africa. ## Why it matters AI training and inference across distant data centers needs far more intercontinental bandwidth. Petal is an example of AI infrastructure spending reaching undersea networking. ## Your AI and this story - GPT-6.2 Astra (training cutoff May 2026): 113 days after its cutoff - Claude Opus 5.5 (training cutoff June 2026): 83 days after its cutoff - Gemini 4 Hydrogen (training cutoff March 2026): 174 days after its cutoff - Grok 4.7 (training cutoff May 2026): 113 days after its cutoff ## Sources 1. [Meta: Announcing Petal, a first-of-its-kind transoceanic subsea cable](https://about.fb.com/news/2026/09/announcing-petal-meta-petabit-transoceanic-cable/) (about.fb.com, official) 2. [DCD: Meta plans Petal, the first transoceanic subsea cable at petabit capacity](https://www.datacenterdynamics.com/en/news/meta-plans-petal-the-first-transoceanic-subsea-cable-at-petabit-capacity/) (datacenterdynamics.com, press) ## Changes - 2026-10-01 (filed): Created (missed pre-window item)