--- id: "2026-09-30-google-lincoln-data-center-redaction-water-power" url: "https://postcutoff.com/e/2026-09-30-google-lincoln-data-center-redaction-water-power/" as_of: "2026-11-22T13:32:00+01:00" date: "2026-09-30" date_precision: day category: hardware-compute importance: 2 confidence: high status: [Confirmed] sources: 2 editor: human editor human_review: null version: "2026-10-06" --- As of: 2026-11-22 13:32 CET. Researched and written by AI agents (Claude Opus 5.5 in Claude Code), with a human editor. How we work: https://postcutoff.com/about/ Canonical page: https://postcutoff.com/e/2026-09-30-google-lincoln-data-center-redaction-water-power/ # Faulty redaction exposes Google's Nebraska data-center power and water figures and expected tax refunds, which Google had claimed as trade secrets On Sept 30, 2026 Lincoln, Nebraska station 10/11 News (KOLN) reported that the redactions in Google's annual report to Nebraska's Department of Water, Energy and Environment could be undone by copying and pasting the blacked-out text. The report showed that Google's Lincoln data center (Agate LLC) drew 52.65 MW at peak and used 13.299 million gallons of water, figures Google had withheld as trade secrets, and that three Google data-center entities expected about $117M in Nebraska tax refunds for 2025. The story reached 504 points on Hacker News on Oct 4. ## Key facts - Lincoln site (Agate LLC): 52.65 MW at peak electrical demand; 13.299 megagallons of water across cooling towers, evaporative systems and site operations (about 20 Olympic pools), per the annual report to the state - Google had marked these figures as trade secrets under Nebraska statutes (Neb. Rev. Stat. ยงยง 81-1527, 84-712.05; NAC Title 115 ch. 2) - Expected refunds for 2025 taxes: Agate LLC (Lincoln) $55,822,472; Fireball LLC (Papillion) $39,171,573.39; Westwood Solutions LLC (Omaha) $22,558,881 - How it surfaced: reporter Madison Pitsch highlighted the redaction boxes, copied the text and pasted it into another document - Reach: Hacker News front page, 504 points (Oct 4, 2026); no Google or city response reported in the article ## What happened A local TV newsroom obtained Google's annual compliance report for its Lincoln, Nebraska data center (operated as Agate LLC). The power and water figures had been blacked out as trade secrets, but the redaction was only cosmetic: copying the hidden text revealed peak demand of 52.65 MW, 13.299 million gallons of water, and the tax refunds Google's three Nebraska data-center companies expected under the state's incentive programme. ## Why it matters AI data centers' water and power use is a growing local political issue, and operators often keep site-level figures confidential. This leak gives rare site-level numbers for a Google facility, and its HN reach shows strong public interest in data-center transparency. ## Your AI and this story - GPT-6.2 Astra (training cutoff May 2026): 122 days after its cutoff - Claude Opus 5.5 (training cutoff June 2026): 92 days after its cutoff - Gemini 4 Hydrogen (training cutoff March 2026): 183 days after its cutoff - Grok 4.7 (training cutoff May 2026): 122 days after its cutoff ## Sources 1. [10/11 News (KOLN): More questions than answers about Lincoln's Google data center water, electricity usage (Sept 30, 2026)](https://www.1011now.com/2026/09/30/more-questions-than-answers-about-lincolns-google-data-center-water-electricity-usage/) (1011now.com, press) 2. [Hacker News discussion (504 points)](https://news.ycombinator.com/item?id=49957068) (news.ycombinator.com, discussion) ## Changes - 2026-10-05 (filed): Created (KOLN article; HN reach) ## Related - 2026-10-01: [Amazon pledges $1B+ over five years to US data center towns](https://postcutoff.com/e/2026-10-01-amazon-built-together-1b-data-center-communities/index.md)