Toyota tells investors factory automation could cost ~¥1T ($6.4B) a year from 2028 and need ~400,000 robots
Partly confirmed
The takeaway
Reuters reported on Sept 18, 2026 that Toyota told investors modernising the factories of Toyota, its group companies and major suppliers could cost about ¥1 trillion (~$6.4B) a year from 2028 and need around 400,000 robots, humanoid and non-humanoid, including replacements.
Status
- Claim
Partly confirmed
- Our reporting
- Medium confidence
- Importance
- 2 of 5
- Last verified
- 26 October 2026
Your AI and this story
- GPT-6.2 Astra110 days after its cutoff
- Claude Opus 5.580 days after its cutoff
- Gemini 4 Hydrogen171 days after its cutoff
- Grok 4.7110 days after its cutoff
None of these four assistants can know about it. The closest, Claude Opus 5.5, stops 80 days before it.
Key facts
- Reuters (Sept 18): estimate covers Toyota, group companies and major suppliers; Toyota did not say whether the spending would definitely happen or for how many years; the ~400,000 robots include replacements and new installations, humanoid and non-humanoid
- Bernstein (note of Sept 18): ‘We expect robotics-related announcements to become more frequent going forward as Toyota accelerates its robotics efforts’
- Just Auto (Sept 21, citing unnamed local reports): humanoids from 2028 working beside people; ~150,000 at headquarters plants and ~250,000 at the group’s 60 production sites worldwide, introduced with model changes and new capacity; humanoid.guide calls the figures provisional
- ELEY (‘Embodied Learning robot for Enhanced Yield’): Toyota’s in-house battery-powered wheeled robot of ~50 kg, being trained by learning line workers’ movements, e.g. picking parts from boxes and folding fabric (Just Auto)
- Toyota (via Just Auto): ‘robots are not meant to replace humans, but will coexist with humans’
- FT (Oct 26, paywalled; Techmeme summary) set the plan alongside Toyota’s Walden Robotics spinout, in competition with Tesla, Xpeng and Hyundai
What happened
At an investor meeting in early September Toyota put a number on factory automation for itself and its suppliers: about ¥1 trillion a year from 2028 and some 400,000 robots. Reuters stressed that this is an estimate, not a commitment, and that it mixes industrial robots, automated logistics and humanoids. Japanese reports relayed by Just Auto describe a humanoid-heavy rollout built around Toyota’s own wheeled ELEY robot.
Why it matters
If even part of it happens, Toyota’s group would be one of the largest robot buyers in the world, comparable in intent to Hyundai’s Atlas plans and Tesla’s Optimus. The figures are company estimates and second-hand reports; the FT entry point for this story was paywalled, so details were taken from the Reuters and Just Auto copies.
Sources
4 sources from 4 sites. Numbers match the chips in the text.
4 sources: 4 press
Press
- The Edge Malaysia (Reuters): Toyota estimates factory automation could cost US$6.4 billion per year from 2028 (Sept 18)theedgemalaysia.com, press
- Just Auto: Toyota to deploy humanoid robots at its global plants from 2028 (Sept 21)just-auto.com, press
- Humanoid.guide: Toyota reportedly plans 400,000 humanoid factory robots (Sept 21)humanoid.guide, press
- Financial Times: Toyota’s robotics push (Oct 26, 2026; paywalled)ft.com, press
Changes
- Filed (FT paywalled, written from Reuters and Just Auto)