Meta announces Petal, the first 1-petabit-per-second transatlantic subsea cable
Confirmed
The takeaway
On Sept 21, 2026 Meta announced Petal, a roughly 7,000 km subsea cable between the US and France’s Atlantic coast designed for 1 petabit per second (1,000 Tbps), about twice today’s top transoceanic systems.
Status
- Claim
Confirmed
- Our reporting
- High confidence
- Importance
- 2 of 5
- Last verified
- 1 October 2026
Your AI and this story
- GPT-6.2 Astra113 days after its cutoff
- Claude Opus 5.583 days after its cutoff
- Gemini 4 Hydrogen174 days after its cutoff
- Grok 4.7113 days after its cutoff
None of these four assistants can know about it. The closest, Claude Opus 5.5, stops 83 days before it.
Key facts
- ~7,000 km (4,300 mi), US to France; design capacity 1 Pbps (1,000 Tbps)
- First subsea system to deploy multi-core fiber at scale
- NEC (system), Sumitomo Electric (fiber), Orange (French landing)
- Expected in service 2029
What happened
Meta added a petabit-class Atlantic link to its private subsea network, which already includes 2Africa.
Why it matters
AI training and inference across distant data centers needs far more intercontinental bandwidth. Petal is an example of AI infrastructure spending reaching undersea networking.
Sources
2 sources from 2 sites. Numbers match the chips in the text.
2 sources: 1 primary, 1 press
Primary
- Meta: Announcing Petal, a first-of-its-kind transoceanic subsea cableabout.fb.com, official
Press
- DCD: Meta plans Petal, the first transoceanic subsea cable at petabit capacitydatacenterdynamics.com, press
Changes
- Filed (missed pre-window item)